- 用户 2026-10-04 确认设计,五个待拍板问题全部采纳推荐:门控排在 P8 收口后;IC5 首次真实 /goal 用于 Phase 4 的卡;首批三章方向在 IC3 定稿;去留阈值初定;接受约 10 行常驻启动读书签
- IC1 ✅;新增「概述」段供 UI 展示;IC2–IC13 每张卡都带 files、complexity、depends 和可执行 acceptance(IC3/IC5/IC10–IC13 另有 human_verify)
- manifest:intent-catalog 转 planned,note 同步;设计文档头标为已确认
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
|
||
|---|---|---|
| .. | ||
| 2026-09-23-blueprint-agent-handoff-pilot.md | ||
| 2026-09-30-dev-variables-materialize.md | ||
| 2026-10-03-coordination.md | ||
| 2026-10-03-p8-onboarding-oneclick-design.md | ||
| 2026-10-04-intent-catalog-design.md | ||